SDO2 antenna maintenance was performed on 8/7 and 8/10 to isolate and remedy low signal levels on the right hand circular polarization (RHCP) path. Maintenance was planned for 8/12 to complete the repair ahead of handover season, which begins on 8/15. However as of 8/15 the maintenance is waiting on availability of a cable; efforts to acquire the cable are underway.